LuminBlock H SeriesC&I All-in-one Hybrid ESS · 37.5–60 kW
Project · Spain · campus

Campus PV and Storage: 175 kWp, Three Cabinets

An educational campus in Spain now covers part of its daily electricity use with an on-site solar-storage plant. Three BES-H60X120 cabinets take 175 kWp of PV on 15 MPPT inputs and hold 360 kWh: daytime generation for teaching buildings, surplus held for evening activity or grid outages.

The site's problems are typical of campuses and hotels: demand rises when classes start, events run after sunset, and an outage takes out lighting, IT and teaching equipment. The cabinets cover self-consumption, evening demand, peak shaving and backup in one product.

175 kWp PV360 kWh storage3 × BES-H60X120Backup essential circuits
The site

Daytime Teaching, Evening Events, Occasional Outages

Campus demand rises during teaching hours, when PV output is still varying. Evening classes and events continue after solar generation has ended. Grid interruptions disrupt lighting, IT systems and teaching equipment, and peak demand charges add to the annual electricity bill.

  • Load: daytime teaching blocks plus evening events.
  • Generation: PV, variable through teaching hours.
  • Risk: outages during lessons and exams.
The problem in the bill

Solar Peaks at Lunchtime, the Campus Peaks Later

Without storage, midday generation is exported at a low value while the campus buys power back in the evening. Peak demand charges are set by the busiest fifteen minutes, not the average day. And an outage stops teaching regardless of how much solar the roof is making.

Storage moves the midday surplus into the evening and into the outage, and trims the demand peak while it does it.

What was built

Three Cabinets, One per Switchboard

Three BES-H60X120 cabinets — 180 kW of hybrid conversion and 360 kWh of storage, 324 kWh usable — take 175 kWp of PV across 15 MPPT inputs. Each cabinet sits at a building switchboard, so PV production, battery charging and grid supply are managed together where the load is, and surplus solar is stored rather than exported.

Stored energy covers the evening peak and keeps essential campus circuits running when the grid drops. Distributing three cabinets across the buildings also spreads conversion instead of concentrating it in one plant room.

ParameterSpecification
System capacity180 kW hybrid conversion, 360 kWh storage (324 kWh usable), 175 kWp PV
Core productsC&I All-in-one Hybrid ESS, BES-H60X120
Device list3 × BES-H60X120 cabinets (15 MPPT inputs), 175 kWp PV array
Operation modeGrid-tied self-consumption with backup capability
Key functionsSolar self-consumption, peak shaving, backup power
What the manufacturer reports

The Reported Benefits

  • Lower daytime energy costs — solar covers campus load while the sun is up.
  • Evening cover from storage — 324 kWh usable carries classes and events after sunset.
  • Backup for teaching — essential circuits stay powered during grid outages.
  • Reduced peak demand — storage trims the site's maximum draw from the grid.
  • Distributed conversion — three cabinets spread the plant across buildings.
Deployment notes

One Cabinet per Building, Wired to Its Own Board

Each cabinet serves the switchboard of its building: PV strings on its MPPT inputs, the building load on its AC port, and the essential circuits on its backup port. One cabinet is the master; the other two follow it, and the campus keeps a single view of state of charge and dispatch.

  • Storage count: 360 kWh nominal, 324 kWh usable across three cabinets.
  • Conversion: 180 kW of hybrid conversion for 175 kWp of PV, with five MPPT inputs per cabinet.
  • Backup: each cabinet's transfer switch covers the essential loads wired to its backup port — the same 'essential circuits only' rule as any backup design.
  • Sizing input: the essential-load list and the evening profile, not the roof area.
FAQ

Questions about these projects

Is this a C&I All-in-one Hybrid ESS installation?

Yes. It uses three BES-H60X120 cabinets, one per building switchboard, taking 175 kWp of PV and holding 360 kWh.

Where do these figures come from?

From the project record: design figures calculated from the campus load profile, PV yield and essential-load list, not independently metered.

Can one cabinet cover a whole campus?

Not one cabinet. Each unit is 37.5–60 kW with 80–120 kWh, so a campus of this size needs several, usually one per building or per switchboard. The backup port covers the essential loads wired to that cabinet, not the entire site.

Request a Quote for a Site Like This

No attachments at this stage. We aim to reply within two working days of a complete enquiry, with the scope broken out and every assumption written down. If a cabinet does not make sense for your site, we say so.