C&I All-in-one Hybrid ESS · method and worked examples

Commercial Battery Storage Sizing

Sizing goes wrong when kilowatts and kilowatt-hours get treated as one number. Power decides what the battery can carry. Energy decides how long it carries it.

Below are three ways to get the energy figure, three worked loads, and the limits that apply once one cabinet is not enough.

37.5–60 kW per cabinet72 / 90 / 108 kWh usable at 90% DoD480 kWh per system with expansion600 kW with ten units in parallel
THE ANSWER

Size Power First, Energy Second

Pick the power rating from your highest sustained load in kW, then pick the energy from how many hours that load has to run without the grid. Usable energy is 90% of nameplate, so a 120 kWh cabinet holds 108 kWh, and duration is usable energy divided by load.

The cabinet covers 37.5 to 60 kW in one unit. If the peak is above that, two units in parallel do the same job without a second design.

THREE METHODS

Three Ways to Reach the Energy Figure

MethodHow it worksBest for
Daily energyShiftable kWh ≈ daily kWh × the share that falls in the peak windowSolar shifting, time-of-use tariffs
Demand shavekWh ≈ peak kW × hours you want to capDemand charges, short peaks
PV ratioPV stays at or below 200% of cabinet ratingNew builds with panels

Oversizing the PV array does not add storage. It adds clipping, because the cabinet can only accept what its MPPT inputs allow.

WORKED LOADS

Three Loads, Three Answers

Each row takes a two-hour backup window. The energy column is what the site needs; the cabinet column is what covers it with margin.

LoadEnergy neededCabinetDelivered window
15 kW30 kWhC&I All-in-one Hybrid ESS BES-H37.5X804.8 h at 15 kW
30 kW60 kWhC&I All-in-one Hybrid ESS BES-H40X802.4 h at 30 kW
60 kW120 kWhC&I All-in-one Hybrid ESS BES-H60X120 plus one battery cabinet3.6 h at 60 kW

The first two land inside one cabinet because the energy is small relative to the rating. The third does not: 60 kW from a single cabinet runs 1.8 hours on 108 kWh, so a second battery cabinet is what buys the extra window.

SITE TYPES

Four Sites and What They Usually Choose

SiteLoad patternTypical choice
Cold storeFlat load, high demand chargeC&I All-in-one Hybrid ESS BES-H60X120, demand shave
HotelEvening peak, backup for essentialsC&I All-in-one Hybrid ESS BES-H50X100 with partial backup
FactoryTwo shifts, motor startsC&I All-in-one Hybrid ESS BES-H60X120, 150% for 10 s
EV chargingShort high peaksC&I All-in-one Hybrid ESS BES-H60X120 plus cabinets as stalls grow

These are starting points. The bills and the survey move the answer, and a site engineer usually moves it again.

LIMITS

Know Where a Single System Stops

One cabinet holds 120 kWh. Three battery cabinets take the same system to 480 kWh, which is eight hours at 60 kW.

Past that, units run in parallel. The ceiling is ten units, which is 600 kW and 4,800 kWh. Above 480 kWh per system the design changes from expansion to parallelism, and the commissioning steps change with it.

FAQ

Questions about commercial battery storage sizing

80 kWh or 120 kWh?

Take the 120 kWh when the peak is near 60 kW or the backup window passes two hours. Otherwise the 80 kWh cabinet leaves budget for the switchgear.

How much energy for backup only?

Usable energy divided by the load you back up. A 25 kW essential load runs about 2.9 hours on 72 kWh.

Two small units or one big one?

Two units at 50 kW cover 100 kW and keep redundancy. One 60 kW unit is simpler and cheaper until the load passes 60 kW.

Check Your Number Against the Cabinet Range

Start with the form. Our sales team asks for the peak load, the backup window and the monthly kWh. The reply shows which model covers it and where a second cabinet starts.

No file upload here. The form goes straight to sales@bsenergystorage.com. After you submit, our sales team contacts you and asks for the bill and any load data it needs. Details stay with the sales team that answers you.