A courier depot turns vans around overnight and keeps sorting lines running, so charging has to fit inside the existing supply. Four 22 kW AC stations and one 120 kW DC charger are buffered by two BES-H60X120 cabinets: 208 kW of charging and 240 kWh of storage.

The depot did not rebuild its connection. The cabinets absorb the charging peak and release energy between sessions, so more vans can leave full from the power the site already has.

208 kW installed charging240 kWh buffer2 × BES-H60X120Existing depot supply
The site

Vans Overnight, Sorting Lines All Day

Vans return after dusk with tight morning departure windows. Overnight charging loads compete with the sorting line for the same supply. Some vehicles need a slow overnight charge; others need to be back in service within a driver break.

  • Load: mixed duty cycles, overnight dwell plus daytime top-ups.
  • Constraint: limited depot power capacity.
  • Requirement: every van full before the morning dispatch window.
The problem in the bill

More Vans Than the Connection Can Charge at Once

Electrifying the fleet without rebuilding the depot's electrical infrastructure means the charger layout has to share the supply that already exists. A wall of simultaneous AC sessions would trip the depot; a single DC charger alone would not return vehicles fast enough. Storage changes when the depot draws power, not how vehicles connect.

The design question was not 'how fast can we charge' but 'how many vans can leave full, on the power we already have'.

What was built

AC for the Night Shift, DC for the Day

Four 22 kW AC stations cover the overnight parking bays and one 120 kW DC charger handles daytime opportunity charging — 208 kW in total. Two BES-H60X120 cabinets sit beside the switchboard as a 240 kWh buffer.

The cabinets charge in the low-price window and discharge when the chargers start; the site controller keeps the depot inside its grid connection and reserves a small state of charge for the sorting line's backup port.

ParameterSpecification
System capacity208 kW charging (4 × 22 kW AC + 1 × 120 kW DC), 240 kWh buffer
Core productsC&I All-in-one Hybrid ESS, BES-H60X120
Device list4 × 22 kW AC stations, 1 × 120 kW DC charger, 2 × BES-H60X120 cabinets
Operation modeGrid-tied buffer with overnight AC and daytime DC charging
Key functionsPeak buffering, time-of-use dispatch, fleet charging, backup of essential circuits
What the manufacturer reports

The Reported Benefits

  • Fleet readiness — every van back in service, fully charged, before the morning dispatch window.
  • Charging inside the existing connection — the buffer covers the peak, so no supply upgrade was needed.
  • Fast turnaround — a vehicle recharged within a driver break at 120 kW DC.
  • Backup for the sorting line — the cabinet transfer switch holds essential circuits through a grid outage.
  • Lower running costs — off-peak electricity replaces a larger share of diesel refuelling.
Deployment notes

How the Buffer Is Dispatched

The two cabinets sit beside the depot's low-voltage board, charging whenever the chargers are idle and the tariff is low. When the DC charger starts, they discharge into the same board; the controller caps the site's import at the connection rating.

  • Buffer: 120 kW of discharge and 216 kWh usable covers the charging peak and the evening load.
  • Backup: the transfer switch holds lighting, IT and the sortation controller through a grid outage.
  • Sizing input: the charging session profile and the depot's peak, not the number of vans.
  • Expansion: the group is two cabinets of a ten-unit limit, so more bays can be added without a new platform.
FAQ

Questions about these projects

Is this a C&I All-in-one Hybrid ESS installation?

Yes. Two BES-H60X120 cabinets buffer a charging installation of four 22 kW AC stations and one 120 kW DC charger, inside the depot's existing supply.

Where do these figures come from?

From the project record: design figures calculated from the depot's charging profile and connection rating, not independently metered.

Would storage replace the charger or the AC stations?

Neither. Storage changes when the depot draws power, not how vehicles connect. The cabinets buffer the peak so more sessions run inside the same connection; they do not replace chargers.

Request a Quote for a Site Like This

No attachments at this stage. We aim to reply within two working days of a complete enquiry, with the scope broken out and every assumption written down. If a cabinet does not make sense for your site, we say so.