One Hybrid Plant: PV, Storage and a Charger
A Polish site combines a ground-mounted array with battery storage and a 120 kW DC charger. Four BES-H60X120 cabinets take the PV directly on their MPPT inputs, hold 480 kWh, and run the charger from generation first, then from the battery.
The constraint is the one most charging sites hit: the charger would overload the grid connection at the evening peak. The cabinets keep it inside that connection, and the same plant can run off-grid when the grid is unavailable.
A Charger, a Solar Array and a Weak Connection
The array is ground-mounted and the charging demand peaks in the evening, after PV output has fallen. Cloud cover moves generation across the working day. PV, storage and charging are dispatched as one plant rather than three separate systems.
- Load: EV charging, with an evening peak.
- Generation: ground-mounted PV, variable through the day.
- Constraint: available grid capacity, not the charger's rating.
A 120 kW Load on a Connection That Cannot Carry It
A 120 kW charger draws more than the site's grid connection can supply on its own at the evening peak. Without storage, the charger would be throttled or the connection rebuilt. PV adds a second variable: generation peaks at midday, charging peaks in the evening.
The plant had to serve the charger from its own generation and storage, and stay inside the grid connection while doing it.
PV, Storage and Charging in One Plant
Four BES-H60X120 cabinets take 240 kWp of PV across 20 MPPT inputs. Their combined 480 kWh of storage buffers the site, and the group runs one 120 kW DC charger.
In off-grid mode the plant serves the charger from solar whenever generation is sufficient; otherwise the batteries make up the difference. Without sunlight the charger runs from storage alone. The cabinet controller coordinates PV, storage and charging; no separate PV inverter or plant controller is needed.
| Parameter | Specification |
|---|---|
| System | 240 kWp PV, 480 kWh storage, 120 kW DC charging |
| Core products | C&I All-in-one Hybrid ESS, BES-H60X120 |
| Device list | 4 × BES-H60X120 cabinets (20 MPPT inputs), 1 × 120 kW DC charger |
| Operation mode | Off-grid capable, PV-priority charging |
| Key functions | Solar self-consumption, storage buffering, EV fast charging, integrated dispatch |
The Reported Benefits
- Charging without grid upgrades — the plant supplies the charger, not the local grid.
- Evening charging from storage — 432 kWh usable carries the charger after sunset.
- Solar used where it is produced — generation goes to vehicles first, not to export.
- One controller — the cabinets coordinate PV, storage and charging; no separate plant controller is needed.
- Resilient operation — the site can run on its own generation when the grid is unavailable.
What the Hybrid Unit Changes on a Site Like This
The cabinet is a hybrid unit: five MPPT inputs, a battery and a 37.5–60 kW AC output in one enclosure. Here the PV connects to the cabinets directly, so the separate PV inverters of a conventional design disappear; the charger is the only other power device on site.
- Discharge capacity: 240 kW across four cabinets, so the 120 kW charger uses half the group's output at full power.
- Storage: 480 kWh nominal, 432 kWh usable — enough for the evening charging window the site defined.
- Backup: the transfer switch and diesel interface are available but unused here; the charger is not an essential load.
- Sizing input: the charging session profile and the grid connection, not the PV array size.
Questions about these projects
Is this a C&I All-in-one Hybrid ESS installation?
Yes. Four BES-H60X120 cabinets take the PV directly, hold 480 kWh and run a 120 kW DC charger. The cabinets replace the separate PV inverters and the plant controller.
Where do these figures come from?
From the project record: design figures calculated from the site's PV yield, charging profile and grid connection, not independently metered.
Can the cabinets run the charger off-grid?
Partly. Four cabinets can form a 240 kW island supply, and the 120 kW charger fits inside it. The charger must be able to follow the island frequency; confirm that with the charger supplier before relying on it.