Peak Shaving at a Moulding Plant: 300 kW / 600 kWh
A Chinese moulding and assembly plant runs two shifts, so demand stays high until late evening. Five BES-H60X120 cabinets work as one 300 kW / 600 kWh plant: they charge in the low-price night window and discharge through the morning and afternoon peaks, holding the site below its contracted demand.
The engineering question is familiar to any factory manager: the monthly demand charge is set by the highest fifteen-minute peak, and equipment starts push the site above its contracted capacity. The cabinet is a hybrid unit, but this project uses it grid-tied only — peak shaving and load shifting, with no PV and no backup load.
Two Shifts, and a Demand That Never Drops
Moulding and assembly run through both shifts. Demand stays high until late evening, and production targets keep rising. The site buys power on an industrial tariff with a demand component, so the shape of the load matters as much as the total.
- Load shape: high and long, with sudden steps when equipment starts.
- Cost driver: the monthly peak, not the annual total.
- Constraint: the contracted grid capacity.
What the Meter Records, and Why It Costs Money
Demand charges scale with the highest fifteen-minute peaks each month. Sudden starts push consumption above the contracted capacity. Cheap overnight power cannot be used during the next day's shift, and rising production increases exposure to volatile industrial tariffs.
The plant did not need more energy. It needed to move cheap energy into expensive hours and stop the peaks from setting the bill.
Five Cabinets Working as One Plant
Five BES-H60X120 cabinets combine into 300 kW of discharge capacity and 600 kWh of stored energy, 540 kWh of it usable. They charge when night tariffs are lowest and discharge through the morning and afternoon peaks, holding site demand below the contracted level.
The site controller reads the 15-minute demand and the state of charge, then sets a discharge target for the master cabinet; the other four follow it as slaves. Dispatch is adjusted as production changes.
| Parameter | Specification |
|---|---|
| System capacity | 300 kW / 600 kWh (540 kWh usable) |
| Core products | C&I All-in-one Hybrid ESS, BES-H60X120 |
| Device list | 5 × BES-H60X120 cabinets, parallel master/slave |
| Operation mode | Grid-tied peak shaving and load shifting |
| Key functions | Peak shaving, time-of-use dispatch, demand cap, site monitoring |
The Reported Benefits
These figures are the manufacturer's project record, not an independent measurement. Read them as the shape of the case, not a promise for another site.
- Demand cap — the cabinets cover the 15-minute peaks above the site's target, so the monthly peak is set by the target, not by equipment starts.
- Energy shifted — 540 kWh usable moves from the night window into the two daily peaks.
- Time-of-use optimisation — charging happens on the cheapest tariff window; discharge at the expensive ones.
- No new connection — the plant stays inside its existing grid capacity.
- Backup option — the transfer switch is unused on this site, but it is there if essential loads are added later.
Where the Cabinets Sit, and What They Need
The five cabinets stand beside the main low-voltage board: one master, four slaves, all inside the ten-unit parallel limit. Commissioning sets the demand target and the tariff windows; the site controller adjusts dispatch as production changes.
- Sizing input: the 15-minute load profile and the contracted capacity, not the annual kWh.
- Duration: 540 kWh usable covers the peak-shaving window the tariff defines; the arithmetic is in the sizing sheet.
- Backup: the transfer switch is not used here; essential loads could be moved to the backup port later.
- Limit: ten cabinets in parallel is the ceiling for this platform; beyond that the design changes.
Questions about these projects
Is this a C&I All-in-one Hybrid ESS installation?
Yes. It uses five BES-H60X120 cabinets in parallel, the 60 kW / 120 kWh model, for grid-tied peak shaving.
Where do these figures come from?
From the project record: design figures calculated from the plant's 15-minute load profile and industrial tariff, not independently metered. Each number on this page comes from that record.
What would the same project look like at another factory?
The same three inputs decide it: the 15-minute profile, the contracted capacity and the tariff windows. A smaller peak might need two or three cabinets; a longer peak needs more energy, not more power.