Industrial Self-Consumption with Battery Storage

A plant that runs two shifts buys power at the tariff's evening peak and exports its roof's output at midday for a fraction of that price. Self-consumption is the share of the array the plant keeps, and the cabinet is what raises it: midday surplus goes into the pack and comes back after the sun drops.

The cabinet does not change the array or the connection. It sits behind the meter, 80 to 120 kWh per unit, 37.5 to 60 kW, and ten units parallel to 600 kW.

200% PV oversizing72–108 kWh usable per cabinet5 MPPT trackers10 ms transfer time
THE MEASURE

What Industrial Self-Consumption Actually Measures

Self-consumption is the share of the array's output the site uses itself instead of sending it to the grid. A plant on one shift uses a third of its roof's yield; a plant on three shifts uses most of it. The cabinet raises the share by holding midday surplus until the load needs it.

The first number to compute is the midday draw, not the array size. A 100 kWp array and a plant drawing 40 kW at noon leaves 60 kW looking for somewhere to go. If that 60 kW is exported at a third of the import price, the gap is what the pack closes.

The second number is the evening load. A pack that fills at midday and empties by 16:00 helps a single-shift plant; a plant that runs to 22:00 needs either a second cabinet or a smaller evening setpoint.

THE LOAD

Why the Plant's Load Beats the Roof's Output

Compressors, chillers, presses and conveyors draw a base load that barely moves. That is the part a battery can serve without touching production. If the base load is 120 kW and the array makes 90 kW at noon, the site absorbs all of it and the pack stays empty until the afternoon cloud.

Where the base load is below the array's output, the surplus is the opportunity. Where it is above, the array is fully absorbed and the cabinet's job shifts to the tariff: charge at the cheap hour, discharge at the expensive one, and hold the demand ceiling at the same time.

THE SIZE

Sizing the Cabinet to the Load, Not the Array

Size on the load profile first, then check the array. The cabinet must cover the evening draw for as long as the tariff's expensive window lasts, and it must accept the midday surplus without clipping more than the array would anyway.

CabinetAC powerEnergyUsable
C&I All-in-one Hybrid ESS BES-H37.5X8037.5 kW80 kWh72 kWh
C&I All-in-one Hybrid ESS BES-H40X8040 kW80 kWh72 kWh
C&I All-in-one Hybrid ESS BES-H49.9X10049.9 kW100 kWh90 kWh
C&I All-in-one Hybrid ESS BES-H50X10050 kW100 kWh90 kWh
C&I All-in-one Hybrid ESS BES-H60X12060 kW120 kWh108 kWh

Usable energy is 90% of nameplate, so a 120 kWh cabinet delivers 108 kWh. At 60 kW that is 1.8 hours of full output, and at 30 kW it is 3.6 hours. Which of the two matters depends on the load shape, not on the model sheet.

THE SHIFTS

Two Shifts, One Shift, and the Weekend

A two-shift plant has a load from 06:00 to 22:00, which overlaps most of the array's output and most of the tariff's expensive hours. It is the easiest case: the pack fills while the plant works and empties while the plant still works.

A single-shift plant empties at 17:00 and the tariff peak often starts after that. Its surplus has nowhere to go unless the site can shift a load later, which is why the weekday profile decides the size more than the roof does. A weekend with no load is a pack that stays full.

THE METER

Where the Meter Still Moves

The cabinet lowers the energy you buy at the expensive hour, and it can hold the site's peak below a ceiling. It does not remove the standing charge, the meter rent or the taxes, and it does not change the connection you already have.

Export caps and reverse-power limits are a site-by-site question. Where the connection will not accept export, the pack is the only way to keep the array's midday output on site. Where export is allowed and paid, the comparison is between the export price and the value of the same kWh in the evening.

THE SITE

What the Site Needs Before the Cabinet Arrives

A pad, a cable route, a breaker and a CT on the incoming supply. The cabinet is 1,349 by 2,100 by 990 mm and 1,025 to 1,303 kg depending on the model, so it arrives on a trailer and is set with a forklift or a crane, not carried through a door.

Commissioning needs the meter's CT ratio and the site's peak record. Without the peak record the shaving setpoint is a guess, and a guess set too low trips the site instead of protecting it.

FAQ

Questions about industrial Self-Consumption

What is industrial self-consumption?

It is the share of a plant's own generation that the plant uses instead of exporting. A cabinet raises that share by storing midday surplus and returning it during the evening load, so the site buys less at the expensive hour and exports less at the cheap one.

How much of a factory's load can one cabinet cover?

One unit covers 37.5 to 60 kW of load for 1.8 to 3.6 hours, depending on the model and the draw. A 120 kWh cabinet holds 108 kWh usable, so at a 30 kW draw it runs 3.6 hours; at 60 kW it runs 1.8 hours.

Does self-consumption work without solar?

Yes. Without an array the cabinet shifts energy from the cheap tariff hours to the expensive ones and holds the site's demand ceiling. The saving comes from the price difference and the demand charge rather than from the roof.

What happens to surplus the site cannot use?

It charges the pack first. Once the pack is full, the surplus either exports, if the connection allows it, or the inverter curtails the array. With 200% oversizing the array can be built for its own yield and the extra clips at midday.

How many cabinets does a 500 kW plant need?

Nine to ten units, since the largest model is 60 kW and ten parallel to 600 kW. The count comes from the peak the site must hold, not from the energy: a 500 kW peak held at 440 kW needs 60 kW of discharge, which is one cabinet.

Is the cabinet certified for grid connection?

It holds CB IEC 62619 and CB IEC 63056 for the battery, and CEI 0-21 for the Italian grid code. Other markets need their own approval, and the certificate you need depends on the country the site is in.

The Load Profile and the Tariff

Send a weekday profile, the array size in kWp and one bill. You get the cabinet count, the usable energy and the share of the array the site would keep, in writing.